Tamarind Westside Construction Photos
(Page 2)
Tamarind Westside Tamarind Westside

Parkade
April 2008...
Parkade construction work is continuing.


Tamarind Westside Tamarind Westside

Parkade
March 2008...
Parkade construction work continues and the storm detention tank is almost complete.


Tamarind Westside Tamarind Westside

Parkade
March 2008...
Building One (Serrano): Parkade construction is proceeding well.


Tamarind Westside Tamarind Westside

Foundation
February 2008...
Foundation work is underway.


Tamarind Westside - Site Preparation Tamarind Westside - Site Preparation

Site Preparation: Shoring
February 2008...
Construction preparation work on the site is proceeding well. Soldier pile shoring installation began in January to stabilize the bank prior to forming for the foundation. Steel I beams are anchored in concrete and infilled with 6" x 6" timber lagging. With the shoring work well underway, foundation form work has also commenced.




Tamarind Westside - Excavation


Tamarind Westside - Excavation

Tamarind Westside: Excavation
November 2007...
Excavation on the Tamarind site is well underway. This extensive "hole in the ground" will ultimately be transformed into the underground parking garage that will span the width of the property under both buildings, Serrano (Building One) and Saffron (Building Two). By the time the excavation has been completed in mid-November, 27,000 cubic metres of soil will have been trucked out of the site.




Back to page 1 photos


Marketed by Quantum Realty Inc.
© 2008 Quantum Properties Inc. All Rights Reserved. This is not an offering for sale. The developer reserves the right to modify plans, prices, features and
specifications without notice as may be necessary and at their sole discretion. E. & O.E.     Contact us: info@tamarindwestside.com